
Rich Table of Contents
How Heavy Haul works from Minnesota to Ohio
Book online
Pickup
Shipping
Delivery
Heavy Haulers from Minnesota to Ohio
5 Star Heavy Equipment Transport Company from Minnesota to Ohio for quality hauling. We provide stress-free machinery hauling from Minnesota to Ohio and on-time delivery for local and long distance.
Heavy Equipment Transport from Minnesota to Ohio
Do you need your heavy equipment shipped from Minnesota to Ohio? We Will Transport It is the company to do the job for you. We have over a decade of experience in heavy hauling. We Will Transport It specializes in heavy equipment hauling in all 50 states. We have a trailer for every equipment size and a team of experts ready to move your unit. Whether you are shipping a full or partial load or even an oversized load, our knowledgeable representatives will handle every detail and keep you informed throughout the process.
The Route between Minnesota and Ohio
The route from Minnesota to Ohio runs southeast via I-94 East. From Minnesota, your equipment will pass through Wisconsin, Illinois, and Indiana before entering Ohio. The distance from the center of Minnesota to the center of Ohio is 886 miles. The trip will take roughly 14 hours. The price to ship your heavy equipment or machinery will be based upon the number of miles your unit is going and the size and weight of the unit.
Below are some examples of prices to ship heavy equipment from Minnesota to Ohio:
From To | Shipping Quote | Miles |
---|---|---|
Rogers, Minnesota 55374 to Columbus, Ohio 43216 | $2,916.00 | 788 miles |
Waseca, Minnesota 56093 to Dublin, Ohio 43017 | $2,675.00 | 723 miles |
Saint Paul, Minnesota 55119 to Milford, Ohio 45150 | $2,623.00 | 709 miles |
Thief River Falls, Minnesota 56701 to Urbana, Ohio 1028 | $3,804.00 | 1,028 miles |
* Prices shown above are from previous jobs we completed in 2023; they fluctuate depending on diesel and the time of the year.
The most popular trailers we use:
- Flatbed
- Two 24 or 28 flatebed
- Car carrier
- Beam Trailer
- Boat hauling Trailer
- Conestoga
- Container Trailer
- Driveaway
- Double drop
- Double Drop extended
- Dump Trucks
- Flatbed “Air Ride”
- FEXT ” Stretch Trailers or Extendable Flatbeds or Extendable Flatbeds
- FO- Flatbed over-Dimension Loads
- FRV- Flatbed, Van or Reefer
- FSDV- Flatbed, Step Deck or Van
- HS- Hotshot Trailer
- HTU- Haul and Tow Unit
- LAF- Landoll Flatbed
- LB- Lowboy
- LBO- Lowboy over dimension Loads
- MBHM- Mobile homes
- PO- Power Only
- RGN- Removable Gooseneck & Multi Axle Heavy Haulers
- Roll- Roll Top Conestoga
- SD- Stepdeck
- SDE – Stepdeck Extendable
- SDO- Step deck over Dimensions loads
- SPV- Cargo, small, sprinter Van
- VIVR- Venter insulated van or Refrigerated
- VLG- Van with Liftgate
- VRDD- Van, Reefer or Double drop
Faq’s
If I move equipment from Minnesota to Ohio, what is the typical turnaround time?
In order to travel between Minnesota and Ohio, an estimated two to three days will be needed. In addition to how loading and unloading go with the other pickups along the route, there are a number of other factors to consider.
Suggested links
A heavy hauling job has been completed from Minnesota to Ohio
2015 Cat D3 LGP . The tractor was picked up from a local farmer in Ohio, and the seller wanted it off his property in three days. Dispatch department began making outbound calls in search of a carrier. A dispatch sheet with all the customer’s information was sent to the carrier two days after we found a lowboy trailer. Call us today to get all your heavy hauling needs taken care of.